Use este identificador para citar ou linkar para este item:
http://repositorio.unis.edu.br/handle/prefix/952
Registro completo de metadados
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.advisor1 | Vieira, Rullyan Marques | - |
dc.creator | Martins, Davi José Alves | - |
dc.date.accessioned | 2019-07-11T18:04:28Z | - |
dc.date.available | 2019-07-11T18:04:28Z | - |
dc.date.issued | 2014-12-05 | - |
dc.identifier.uri | http://repositorio.unis.edu.br/handle/prefix/952 | - |
dc.description.abstract | This work deals with the reduction of setup time of thermoplastic injection machines, using the STR (Rapid Tool Exchange System). The setup time is an important part of the thermoplastic industries, because the longer the setup takes, the greater the final price of the part, which will consequently decrease the company's competitiveness in the market. Therefore the need for a management tool, to manage this bottleneck and minimize as much as possible. There are several methodologies that tend to attack the setup bottlenecks, thus assisting and adding the STR, such as SMED (Single Minute Exchange of Die) created by Shingo, one of the great engineering gurus. Thus the STR becomes a primordial tool to optimize the process of exchange of thermoplastic injection mold. | pt_BR |
dc.description.resumo | Este trabalho trata da redução do tempo de setup de máquinas de injeção termoplástica, utilizando o STR (Sistema de Troca Rápida de Ferramenta). O tempo de setup é uma fatia importante nas indústrias termoplásticas, pois quanto mais demorado for a execução do setup, maior será o preço final da peça, que consequentemente diminuirá a competitividade da empresa no mercado. Por isso a necessidade de uma ferramenta de gestão, para gerir esse gargalo e minimizar o máximo possível. Há várias metodologias que tendem a atacar os gargalos do setup, assim auxiliando e acrescentando o STR como, por exemplo, o SMED (Single Minute Exchange of Die) criado por Shingo, um dos grandes gurus da engenharia. Assim o STR se torna uma ferramenta primordial para otimizar o processo de troca de molde de injeção termoplástico. | pt_BR |
dc.description.provenance | Submitted by Regiane Paulino (regiane.paulino@unis.edu.br) on 2019-07-11T18:04:28Z No. of bitstreams: 1 Davi José Alves Martins.pdf: 8933820 bytes, checksum: c1ce090b8637fb9a164e58843b0a5687 (MD5) | en |
dc.description.provenance | Made available in DSpace on 2019-07-11T18:04:28Z (GMT). No. of bitstreams: 1 Davi José Alves Martins.pdf: 8933820 bytes, checksum: c1ce090b8637fb9a164e58843b0a5687 (MD5) Previous issue date: 2014-12-05 | en |
dc.language | por | pt_BR |
dc.publisher | Fundação de Ensino e Pesquisa do Sul de Minas | pt_BR |
dc.publisher.country | Brasil | pt_BR |
dc.publisher.department | Centro Universitário | pt_BR |
dc.publisher.initials | FEPESMIG | pt_BR |
dc.rights | Acesso Aberto | pt_BR |
dc.subject | Setup | pt_BR |
dc.subject | Sistema de troca rápida de ferramental | pt_BR |
dc.subject | Molde Termoplástico | pt_BR |
dc.subject.cnpq | CNPQ::ENGENHARIAS::ENGENHARIA MECANICA | pt_BR |
dc.title | SISTEMA RÁPIDO DE TROCA DE MOLDES DE INJEÇÃO TERMOPLÁSTICOS | pt_BR |
dc.title.alternative | DAVI JOSÉ ALVES MARTINS | pt_BR |
dc.type | Trabalho de Conclusão de Curso | pt_BR |
Aparece nas coleções: | Engenharia Mecânica |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Davi José Alves Martins.pdf | 8,72 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.