Please use this identifier to cite or link to this item: http://repositorio.unis.edu.br/handle/prefix/1001
metadata.dc.type: Trabalho de Conclusão de Curso
Title: COMPARATIVO ECONÔMICO ENTRE SOLUÇÕES CONSTRUTIVAS PARA RECUPERAÇÃO DA ÁREA DE IMPLANTAÇÃO DE UMA REDE INTERCEPTORA DE ESGOTOS SANITÁRIOS: estudo de caso
Other Titles: EDENILSON JOSÉ DA SILVA
metadata.dc.creator: Silva, Edenilson José da
metadata.dc.contributor.advisor1: Vasconcelos, Ivana Prado de
metadata.dc.description.resumo: Este trabalho tem como objetivo o comparativo econômico entre duas alternativas construtivas para recuperação da área de implantação de uma rede interceptora de esgotos sanitários. A primeira com utilização de gabiões na contenção do solo danificado por erosão. Posteriormente, tem-se a opção pela técnica de contenção de solo, utilizando solo cimento ensacado, popularmente conhecido como rip-rap. Os projetos foram desenvolvidos mediante análises hidrológicas para caracterização do córrego e caracterização do solo que compõem a área de rede interceptora. Adoram-se por duas alternativas, altura de contenção em 4 metros e base de 3 metros. Optou-se por estruturas de contenção de solo visando à proteção da rede danificada ao longo de dois trechos específicos, visto que a proximidade da rede com o córrego vem potencializando o problema em estudo. Além disso, ao se efetuar as análises e comparativos, obteve-se a melhor alternativa para a situação desejada no aspecto financeiro, vista no muro em gabião. O resultado para comparações foi obtido mediante orçamento estimativo de toda extensão dos muros, sendo 284 metros lineares.
Abstract: The objective of this work is the economic comparison between two constructive alternatives to recover the area of ​​implementation of a sewage interceptor network. The first using gabions to contain erosion-damaged soil. Later, one has the option of the soil containment technique, using bagged cement soil, popularly known as rip-rap. The projects were developed through hydrological analysis for stream characterization and soil characterization that make up the interceptor network area. They love each other for two alternatives, containment height at 4 meters and base at 3 meters. Soil retention structures were chosen to protect the damaged network along two specific sections, since the proximity of the network to the stream has been potentiating the problem under study. In addition, by carrying out the analyzes and comparisons, we obtained the best alternative to the desired financial situation, as seen from the gabion wall. The result for comparisons was obtained by estimating budget of the entire length of the walls, being 284 linear meters.
Keywords: Rede Interceptora de Esgotos Sanitários
Gabiões
Solo Cimento Ensacado
Comparativo econômico
metadata.dc.subject.cnpq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
metadata.dc.language: por
metadata.dc.publisher.country: Brasil
Publisher: Fundação de Ensino e Pesquisa do Sul de Minas
metadata.dc.publisher.initials: FEPESMIG
metadata.dc.publisher.department: Centro Universitário
metadata.dc.rights: Acesso Aberto
URI: http://repositorio.unis.edu.br/handle/prefix/1001
Issue Date: 1-Dec-2014
Appears in Collections:Engenharia Civil

Files in This Item:
File Description SizeFormat 
Edenilson José da Silva.pdf10,3 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.