Please use this identifier to cite or link to this item: http://repositorio.unis.edu.br/handle/prefix/1582
metadata.dc.type: Trabalho de Conclusão de Curso
Title: O PILAR MANUTENÇÃO PROFISSIONAL NA METODOLOGIA WCM - MANUFATURA DE CLASSE MUNDIAL
Other Titles: LEANDRO PENA AURELIANO
metadata.dc.creator: Aureliano, Leandro Pena
metadata.dc.contributor.advisor1: Vieira, Rullyan Marques
metadata.dc.description.resumo: Este documento estuda o pilar de Manutenção Profissional dentro da metodologia WCM (World Class Manufacturing), que com base nos 7 passos, visa a redução de perdas nos processos produtivos, aumento da disponibilidade e confiabilidade, estabilização do MTBF (Mean Time Between Failures ou Tempo médio entre falhas), mudança de cultura e motivação das pessoas, melhoria continua, a tendência de quebra zero nas máquinas, maior produtividade e segurança e principalmente a redução de custos de manutenção nos equipamentos envolvidos. Com o estudo realizado no pilar Desdobramento de Custos é publicado onde devem se concentrar os esforços e investimentos para se trabalhar na máquina e ou equipamento que realmente encontram-se as maiores perdas, quebras e falhas. E em consequência alcançar os resultados esperados. Neste trabalho é feito o estudo de caso em uma máquina cujos indicadores estavam em um índice ruim e após a implantação desta metodologia e seguindo os passos se obteve resultados muito significativos o que dá força e credibilidade a esta ferramenta.
Abstract: This document studies the Professional Maintenance pillar within the WCM (World Class Manufacturing) methodology, which, based on the 7 steps, aims to reduce losses in production processes, increase availability and reliability, stabilize MTBF (Mean Time Between Failures or Time) average between failures), culture change and people motivation, continuous improvement, the tendency of zero break in the machines, greater productivity and safety and mainly the reduction of maintenance costs in the equipment involved. With the study carried out on the Cost Breakdown pillar, it is published where efforts and investments must be concentrated to work on the machine and / or equipment that really find the greatest losses, breaks and failures. As a result, achieve the expected results. In this work, a case study is done on a machine whose indicators were in a bad index and after the implementation of this methodology and following the steps, very significant results were obtained, which gives strength and credibility to this tool.
Keywords: Manutenção profissional
Word Class Manufacturing
Indicadores
metadata.dc.subject.cnpq: CNPQ::ENGENHARIAS::ENGENHARIA MECANICA
metadata.dc.language: por
metadata.dc.publisher.country: Brasil
Publisher: Fundação de Ensino e Pesquisa do Sul de Minas
metadata.dc.publisher.initials: FEPESMIG
metadata.dc.publisher.department: Centro Universitário
metadata.dc.rights: Acesso Aberto
URI: http://repositorio.unis.edu.br/handle/prefix/1582
Issue Date: 1-Nov-2013
Appears in Collections:Engenharia Mecânica

Files in This Item:
File Description SizeFormat 
Leandro Pena Aureliano 149628.pdf6,31 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.