Use este identificador para citar ou linkar para este item: http://repositorio.unis.edu.br/handle/prefix/1059
Tipo: Trabalho de Conclusão de Curso
Título: READEQUAÇÃO DO SISTEMA DE DRENAGEM PLUVIAL INTERLIGANDO OS BAIRROS SAGRADO CORAÇÃO E PARQUE DOS PINHEIROS EM PARAGUAÇU - MG
Título(s) alternativo(s): MARCIO HENRIQUE DE SOUZA
Autor(es): Souza, Márcio Henrique de
Primeiro Orientador: Ribeiro Júnior, Leopoldo Uberto
Resumo: Este trabalho apresenta uma proposta para solucionar os problemas que vêm enfrentando os moradores das ruas Odilon Prado e Jorge Prado, no bairro Parque dos Pinheiros, em Paraguaçu, Minas Gerais. No período de chuvas intensas estes logradouros se alagam criando uma situação desconfortável para os tráfegos viários de pedestres e moradores do local. Foi realizado um estudo de caso sobre as possíveis causas destes alagamentos sendo este focado no loteamento Sagrado Coração, localizado à montante do local dos alagamentos. Devido à implantação deste novo loteamento houve um acréscimo de áreas impermeabilizadas, através da implantação de asfaltos, calçadas, o que fez aumentar o escoamento superficial, visto que as obras de drenagem do novo loteamento não foram concluídas, modificando o cenário da bacia hidrográfica que antes era composta somente por área verde. Para propor uma solução para este problema foram realizadas análises sobre o sistema de drenagem atual do local onde, através de pesquisas feitas e avaliação econômica, apresenta-se uma proposta que visa sanar o problema existente fazendo com que o sistema de drenagem das áreas estudadas funcione de forma eficiente e segura.
Abstract: This paper presents a proposal to solve the problems that are facing the residents of Odilon Prado and Jorge Prado streets, in the Parque dos Pinheiros neighborhood, in Paraguaçu, Minas Gerais. In the period of heavy rains these streets are flooded creating an uncomfortable situation for pedestrian traffic and local residents. A case study was carried out on the possible causes of these floods, focusing on the Sacred Heart Allotment, located upstream of the flooding site. Due to the implementation of this new subdivision, there was an increase of waterproofed areas, through the implementation of asphalts, sidewalks, which increased the surface runoff, since the drainage works of the new subdivision were not completed, changing the scenery of the watershed that before it was composed only of green area. To propose a solution to this problem, analyzes were performed about the current drainage system where, through research and economic evaluation, a proposal is presented that aims to remedy the existing problem by making the drainage system of the studied areas work efficiently and safely.
Palavras-chave: Drenagem
Microdrenagem
Paraguaçu-MG
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
Idioma: por
País: Brasil
Editor: Fundação de Ensino e Pesquisa do Sul de Minas
Sigla da Instituição: FEPESMIG
metadata.dc.publisher.department: Centro Universitário
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.unis.edu.br/handle/prefix/1059
Data do documento: 30-Nov-2015
Aparece nas coleções:Engenharia Civil

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Marcio Henrique de Souza.pdf6,08 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.